Process · First call to handover

How Long Does a Custom Kitchen Take? Our Process

How long does a custom kitchen take? Usually 6 to 10 weeks from signed design to installed cabinets. Here is every step of our custom kitchen process, how long it takes and when each payment is due.

Design
1 to 2 weeks
Production
3 to 5 weeks
Install
2 to 8 days
Payments
30 / 40 / 30
Custom Kitchen in Edmonton, by Boreal Kitchens
DWG-039.02 · 7 steps
7 steps

Our custom kitchen process, from first call to handover

  1. 01

    1. Request and first call

    1 to 2 days

    Send the quote form, leave your WhatsApp number or call us. We reply within one business day, ask about the room, style, timing and budget, and give a first range if you have rough sizes.

  2. 02

    2. Paid on-site measure

    1 to 2 hours on site

    We measure every wall, ceiling and opening, note plumbing, electrical and vent locations, check floors for level, and bring door and countertop samples. The measure fee is credited to your order.

  3. 03

    3. 3D design and quote

    1 to 2 weeks

    Our designer builds a 3D model and a line-by-line quote. You get revisions until the layout, materials and price are right.

  4. 04

    4. Contract and 30% deposit

    Payment 1: 30%

    You approve the final drawings and sign. The 30% deposit books your production slot and orders materials. Once production starts, the deposit is non-refundable except where the law requires otherwise.

  5. 05

    5. Production

    3 to 5 weeks

    Panels are cut on our CNC, edged on our edge-bander, drilled and assembled with Blum hardware. Doors are pressed, painted or veneered depending on your finish.

  6. 06

    6. Delivery and installation

    2 to 8 days on site; Payment 2: 40%

    We deliver, protect your floors and install: levelling, fastening to studs, scribing fillers and panels, adjusting doors and drawers. The 40% payment is due when production is complete, before delivery. Stone countertops are templated after cabinets are in and fitted 1 to 3 weeks later.

  7. 07

    7. Walkthrough and handover

    Payment 3: 30%

    We walk through every door, drawer and panel with you, fix anything on the list, and hand over care notes and your written warranty. The final 30% is due after the walkthrough.

DWG-039.03 · Payments
Payments

Kitchen cabinet deposit and payments: three, each tied to a step

30%At signing, before production
40%When production is complete
30%After install and walkthrough
DWG-039.04 · Timelines
Timelines

Custom kitchen timeline and other project timelines

ProjectDesignProductionOn site
Full custom kitchen1 to 2 weeks3 to 5 weeks3 to 8 days, plus stone top 1 to 3 weeks later
Walk-in closetAbout 1 week2 to 4 weeks1 to 2 days
Bathroom vanityAbout 1 week2 to 4 weeks1 day
Mudroom, pantry, laundryAbout 1 week2 to 4 weeks1 to 3 days
Cabinet refinishingA few days1 to 2 weeks (doors in our spray booth)2 to 4 days

On-site days are installation only. Production and delivery add to them. Your agreement has a schedule for your project.

DWG-039.05 · Other trades
Other trades

Kitchen cabinet installation and other trades: who does what

We are a cabinetry company. We don't do plumbing, electrical, gas or drywall. We coordinate licensed partner trades, or work with the trades you already have, and plan the sequence so nobody waits on anyone.

  • Rough-in changes happen before cabinets arrive
  • Sink and cooktop hook-ups happen after countertops
  • Backsplash tile goes in after the top is set
  • We share drawings with every trade on the job
Custom Kitchen in Edmonton: sink run
DWG-039.06 · FAQ
FAQ

Questions about the kitchen renovation timeline

01How long does a custom kitchen take from start to finish?+

Plan on 8 to 12 weeks from the first call: about 1 to 2 weeks for measure and design, 3 to 5 weeks of production, 2 to 8 days of installation, and 1 to 3 weeks more for a stone countertop. Decisions made quickly keep it at the short end.

02Can I change the design after signing?+

Small changes are usually possible before production starts. After panels are cut, changes may affect price and timing, and we confirm both in writing first.

03Can I use my kitchen during installation?+

Usually not for most of the install. We help you plan a temporary kitchen and tell you which days the water will be off.

04What can delay a project?+

Mostly decisions made late, other trades running behind, or a supplier delay on special materials. We tell you as soon as we know.

05Do you remove the old cabinets?+

Yes, if you want. Removal and disposal is a separate line in the quote.